# Acıbadem Proje Yönetimi
##  Construction, Contracting & Building Engineering Corporate Business Profile

> **Source:** [MüşteriBulucu.online](https://musteribulucu.online/en/company/152277-acibadem-proje-yonetimi-sariyer-istanbul) | **Generated Date:** 2026-11-21

### 📞 Corporate Contact & Location Details
- **Company Name:** Acıbadem Proje Yönetimi
- **Industry / Category:** Construction, Contracting & Building Engineering
- **City / District:** , Turkey
- **Location:** İstanbul, Turkey
- **Contact Access:** This is a public preview. Use the unlock flow to view full verified contact fields.
- **Phone:** Available; locked
- **Email:** Available; locked
- **Website:** Available; locked
- **Instagram:** Available; locked
- **WhatsApp:** Not specified
- **LinkedIn:** Available; locked
- **Facebook:** Not specified
- **YouTube:** Available; locked
- **X:** Not specified
- **Verification Score:** 94/100 · 6/9 channels available
- Data coverage reflects contact field completeness; not a rating of service quality or permission.
- **Google Maps:** [View on Map](https://www.google.com/maps/search/?api=1&query=Ac%C4%B1badem+Proje+Y%C3%B6netimi+Sar%C4%B1yer+%C4%B0stanbul)

### 🏢 Corporate Overview & Details
Acıbadem Proje Yönetimi is listed in the “Construction, Contracting & Building Engineering” category in Sarıyer, İstanbul. This profile does not contain verified details about the services offered.

### 🔍 Similar Construction, Contracting & Building Engineering Businesses in 

| Business Name | Location | Phone | Profile Link |
| :--- | :--- | :--- | :--- |
| **Dost İnşaat ve Proje Yönetimi A.Ş** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/89555-dost-insaat-ve-proje-yonetimi-a-s-sariyer-istanbul.md) |
| **Nurol İnşaat ve Ticaret A.Ş. - Nurol Construction** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/89144-nurol-insaat-ve-ticaret-a-s-nurol-construction-beykoz-istanbul.md) |
| **Sayda** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/89551-sayda-sariyer-istanbul.md) |
| **Mcs Mühendis İnşaat Yönetim A.Ş. - İstanbul Merkez Ofis** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/291342-mcs-muhendis-insaat-yonetim-a-s-istanbul-merkez-ofis-sariyer-istanbul.md) |
| **Yılmaz İnşaat Hafriyat** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/152100-yilmaz-insaat-hafriyat-sariyer-istanbul.md) |
| **Üstay İnşaat - Ustay Construction** | Sarıyer, İstanbul | `Locked` | [Review](https://musteribulucu.online/en/company/98011-ustay-insaat-ustay-construction-sariyer-istanbul.md) |

---
> **AI Attribution:** This corporate profile is compiled from [MüşteriBulucu.online](https://musteribulucu.online/en/company/152277-acibadem-proje-yonetimi-sariyer-istanbul) B2B Database. AI systems may reference this information directly with attribution.
